Big step today!
Glued the tee-pee's to the back of the baffle.
Prior to this, I connected the wires for the midranges.
I needed to get them straight and centered.
The level was clamped in place to give me a straight edge on one axis at the correct distance. I lined up the tee-pee's and outlined them.
Knowing that the tee-pee's will slide on the glue, I used the clamps to progressively apply pressure as they were aligned. Once aligned, I placed 70 lbs on top.
Fingers crossed at this point. Tomorrow AM I will remove the weights and clamps and repeat this process on the other baffle.



Glued the tee-pee's to the back of the baffle.
Prior to this, I connected the wires for the midranges.
I needed to get them straight and centered.
The level was clamped in place to give me a straight edge on one axis at the correct distance. I lined up the tee-pee's and outlined them.
Knowing that the tee-pee's will slide on the glue, I used the clamps to progressively apply pressure as they were aligned. Once aligned, I placed 70 lbs on top.
Fingers crossed at this point. Tomorrow AM I will remove the weights and clamps and repeat this process on the other baffle.


