• Welcome to The Audio Annex! If you have any trouble logging in or signing up, please contact 'admin - at - theaudioannex.com'. Enjoy!
  • HTTPS (secure web browser connection) has been enabled - just add "https://" to the start of the URL in your address bar, e.g. "https://theaudioannex.com/forum/"
  • Congratulations! If you're seeing this notice, it means you're connected to the new server. Go ahead and post as usual, enjoy!
  • I've just upgraded the forum software to Xenforo 2.0. Please let me know if you have any problems with it. I'm still working on installing styles... coming soon.

Heeman - Dedicated HT Room?

Shows the 2 new ac vents, the one that was disconnected is behind the cardboard.

renoht008_zps8e899583.jpg


You can see by the ceiling paint were the ceiling fixture used to be and where it is now. Also the other ceiling fixture removed.

renoht003_zps6188dc45.jpg


New Washer/Dryer location (sorry, out of focus)

renoht004_zps0ec6d0c2.jpg
 
Picked up some nice tile and grout for the new Laundry/Bathroom floor. Even though I have tiled before, I will sub out the installation of the tile, they will be in and out in no time.

Framing starts tomorrow AM.

Sunday will be no work due to the Daytona 500.

Yes Chris, I will post pictures....... :eek:bscene-buttred:
 
Thanks Randy................today we did, I am BEAT!!!!

The bathroom walls are now up including the pocket door. Had to run some electrical for the Bathroom light switch and all the little details with snaking wire through and around joist in the attic, just take a heck of a long time.

I would love to frame the back theater wall tomorrow, however Barb has convinced me to take the day off to watch the Daytona 500.................horrific crash in today's Nationwide series race with many fans hurt..........

I will post some pics tomorrow of today's progress.
 
Tile

renoht001_zps4f34b94a.jpg


Bathroom back wall extension

renoht003_zpsbece3ac8.jpg


Bathroom front wall framed

renoht010_zps3900f71a.jpg


Pocket door in

renoht014_zps5bf36d69.jpg


renoht011_zps590c273b.jpg


Tomorrow, Monday 2/25 will be 3 weeks into this project.....
 
Started to frame the back Theater wall last night (which is also the left laundry room wall). The laundry area does not appear to be as small as we thought, this is a positive, just lost a ton of storage space.

Anchored down the bottom plate to the concrete, screwed the top plate into the joists and put up about 80% of the studs. Should finish this wall before the weekend and then I start the drywall/Sheetrock process!

Kickin' Ass Baby....... :music-rockout: :music-rockout: :music-rockout:
 
I sure would love to kill a bottle of this Mezcal from Oaxaca, the only Mezcal (this one has the scorpion in it, not the worm):

Repo_bottle_shot2.gif


While we enjoy your new addition down there in the Valley !
 
Killing bottles of alcohol is one of my favorite hobbies............

Come on down!!

:music-rockout: :music-rockout:
 
Finished framing the wall tonight......

Should be drywalling/sheetrocking this weekend!!

renoht002_zps49598c4b.jpg
 
It's looking awesome Heeman. I can't wait to see more pics and hopefully the finished product (in person) soon.
 
Towen7 said:
It's looking awesome Heeman. I can't wait to see more pics and hopefully the finished product (in person) soon.


Thanks Tom!!

I gotta get this Laundry/half bathroom finished before I even start the theater, and I have to relocate the office also. I just continue to focus on the immediate goal and that has seemed to keep me motivated and focused.

I told Barb that I am not waiting for the weekend to Drywall. I am stopping at Home Disappointment on the way home from work tonight to pick up some sheetrock and will start hanging tonight!! Why Wait!!

:music-rockout: :music-rockout:
 
A lot of progress again this weekend......I have aches and pains where I never had before!!

95% of the drywall is up, just a few area's in the half bath left! Hope to finish during the week and to start spackling........

Maybe paint this coming up weekend????

:music-rockout: :music-rockout:
 
Excellent. That's a big project, congrats on making so much progress relatively fast! I'd never get it done...
 
^ Thanks Paul! I have not been this active in a very long time.

The motivation comes from the dedicated HT Room that has been a goal of mine for many years. Never with a screen and projector, that has only been a want since I met you guys at T7's GTG, John's GTG and Chris's GTG!

It is all coming together now!!
 
I only worked on the project one night this week after work.

I need to insulate the 1/2 bath wall where the plumbing is and put up a couple of pieces of drywall, then it is time to tape and float.

I can't wait to get this part of the renovation completed so I can then take a deep breath and start the Home Theater portion......
 
Back
Top